The world leader in neurological therapies initiated a plan to bring their clinical packaging from a CMO to an in-house operation. The plan required tripling the current operational capacity.
Summary of Engagement
Lean Biologix instituted several process improvement initiatives as well as specifying, installing and validating additional automation equipment. LBX streamlined all of the manufacturing SOPs and Batch records and segregated the label printing operation from the production area. LBX also specified, installed and validated a new high-speed label applicator. The resulting increase in area capacity was easily able to handle the additional work with the addition of only 1 operator.